“Disclaimer: this report was not verified with the TK Panel members in the same way as TK Panel Reports 1 through 12. In the past TK Panel members provided feedback on the draft report, then the facilitators edited the report to reflect the comments. The last step was for the TK Panel members to verify that they agreed with all the changes that were made to the report by the facilitators. This final step did not take place for the 2021 Diavik Diamond Mine Aquatic Effects Monitoring Traditional Knowledge Program Report”.
Date:
Monday, March 6, 2023
Type: