Skip to main content
Home
  • About Us
    • EMAB Board
    • Funding
    • Parties to the Environmental Agreement
  • Priorities
  • What we do
    • EMAB Recommendations
    • Monitoring Diavik
    • Monitoring The Regulators
    • Supporting Communities
  • News
  • Events
  • Library
  • Resources
    • Gallery
    • Links
  • Contact

Search form

  1. Home
  2. Technical Reviews
  3. AEMP Technical Reviews

AEMP Technical Reviews

2004 AEMP

File Attachment: 
PDF icon 2005-06-25-emab_2004_aemp_review.pdf
Date: 
Thursday, March 31, 2005
Type: 
AEMP Technical Reviews
  • Read more about 2004 AEMP

2003 AEMP

File Attachment: 
PDF icon 2005-02-16-2003_review_of_2003_annual_report.pdf
Date: 
Wednesday, March 31, 2004
Type: 
AEMP Technical Reviews
  • Read more about 2003 AEMP

2014 AEMP Annual Report

File Attachment: 
PDF icon nsc_2015_aemp_to_emab.pdf
Date: 
Friday, October 31, 2014
Type: 
AEMP Technical Reviews
  • Read more about 2014 AEMP Annual Report

AEMP Design Plan Version 4.0

File Attachment: 
PDF icon nsc_draft_design_plan_v4.0_sep23_16.pdf
Date: 
Friday, September 23, 2016
Type: 
AEMP Technical Reviews
  • Read more about AEMP Design Plan Version 4.0

2011 to 2013 AEMP Re-evaluation Report

File Attachment: 
PDF icon nsc_final_2011-13_v3_1.pdf
Date: 
Wednesday, March 20, 2013
Type: 
AEMP Technical Reviews
  • Read more about 2011 to 2013 AEMP Re-evaluation Report
  • first
  • previous
  • 1
  • 2
  • 3

Looking for our document library?

Search documents

The Environmental Monitoring Advisory Board for the Diavik Project provides oversight of Diavik Diamond Mine and the regulatory process to ensure protection of the land, water, air and wildlife in the Lac de Gras area.

Gallery

Contact

2nd Floor, Room 204

5006 Franklin Avenue

P.O. Box 1364

Yellowknife, NT X1A 2P1

1.867.766.3682

emab1@northwestel.net

 

Visit EMAB on Facebook

Copyright © 2017 Environmental Monitoring Advisory Board (EMAB)​